INSTITUTIONAL
Memorial Elementary School
Medway, MA
Project: Entrance Vestibule Renovation
The project was the renovation of the main entrance vestibule area including the build of concrete handicap ramps. The vestibule was a enclosed an secured vestibule with video surveillance devices and electronic access door systems.
McGovern Elementary School
Medway, MA
Project: Interior Work, Ramps
This was project was the renovation of the existing vestibule school entrance to a secure enclosed entrance and bring it up to ADA compliance. Project consisted building handicap concrete ramp with metal guard rail to meet ADA code conformity. Installation of electronic activated entrance doors with security monitoring and electronic access operation devices.This was project was the renovation of the existing vestibule school entrance to a secure enclosed entrance and bring it up to ADA compliance. Project consisted building handicap concrete ramp with metal guard rail to meet ADA code conformity. Installation of electronic activated entrance doors with security monitoring and electronic access operation devices.
University of Massachusetts
North Dartmouth, MA
Project: Multi-Purpose Room
UMass - Dartmouth Campus was the Renovation and fit-out for sports press box overlooking the gymnasium basketball courts and the build of a trophy display room along with coaches video and conference room
Framingham State University
Framingham, MA
Project: Renovations to Corinne,
Mann & Pierce Halls
This project was the build-out of the student lounge and kitchen area located at the Resident Corinne Towers Apartments and the upgrade and bringing to ADA code compliance of the two stairwell located at the Resident Horace Mann Apartment complex.